Menu
 

Agios Nikolaos - Roadway

This is the construction of the connecting axis of the roads Heraklion-Kalo Chorio. The new road will be 10 km long and a total of 19 bridges will be built with prefabricated-prestressed beams.

With the equipment of the company Doka, we managed to provide solutions for the construction of large circular pedestals. One-sided retaining formwork was used as well as a mobile stretcher for the construction of side pavements.

  • 0036
  • 01
  • 02
  • 03
  • 04
  • 250520134304
  • 250520134308
  • IMG_0513
  • IMG_1306