Malia Harbour
The company was responsible for the construction of a small port for the city of Mallia. We constructed the stone blocks from concrete on land, then they were sunk by a floating crane up to sea level and then, with the use of a special crane (of Doka company), the transitional sector was built so as to ensure maximum protection and safety for the boats.