City Hall of Peza

In the autumn of 2005, the construction of the City Hall of Peza began. Due to the large area of coverage of the erected building, it was considered necessary to use an electric crane.

To complete the work in a short time, it was necessary to use Doka molds. The particular form of construction imposed the use of curved formwork.